Exterior and interior signs that meet landlord criteria, pass permits, and open on time.
Signage is often the last trade on a tenant improvement and one of the first things customers see. It also has its own approvals: the landlord’s sign criteria, a separate sign permit in most cities, and electrical inspection for illuminated signs.
Our network connects owners and tenants with licensed signage contractors who design, permit, fabricate, and install exterior and interior signs so they are ready when the doors open.
A typical tenant improvement may include:
Each type has different approval paths, so it helps to list them all early.
Most shopping centers and office buildings have written sign criteria. They typically control:
Landlord approval usually comes before the city will accept a sign permit application.
Most jurisdictions require a separate permit for exterior signs:
Sign permits often run on a different timeline from the building permit, so start them early.
Illuminated signs need power and controls planned during the build-out:
Running the sign circuit during rough-in is far cheaper than adding it after the space is finished.
Interior signage is not just branding. Many signs are required by code:
These signs are checked at final inspection, so they need to be ordered with enough lead time.
Signs are custom fabricated, which affects the schedule:
Ordering signs as soon as approvals are in hand helps the store or office open with its name on the building.
In most multi-tenant properties, yes. Cities often ask for proof of landlord approval, and the landlord’s criteria may be stricter than the city’s rules.
Permanent rooms and spaces generally require tactile and Braille identification signs under accessibility standards, and inspectors check them at final.
Design, landlord approval, permitting, and fabrication together often take several weeks or more, so start the process early in the build-out.