Decisions made before design starts shape the cost, schedule, and success of the whole build-out.
Planning is the first of five stages in a tenant improvement: planning, permitting, budgeting, construction, and closeout. It is also the stage where changes are cheapest. Moving a wall on paper costs almost nothing; moving it after framing costs real money and time.
This guide walks through what owners, tenants, and brokers should settle before design begins, so the rest of the project builds on a solid foundation.
Start with the business, not the floor plan. Write down:
A short program document keeps everyone designing toward the same goals.
A test-fit is a quick layout showing how the program fits a candidate space:
Test-fits are often done before the lease is final so findings can be negotiated into it.
The work letter defines who builds and pays for what:
Our guide to the tenant improvement allowance explains how TIAs are usually structured.
Most tenant improvements need a core team:
Bringing the general contractor in early helps catch cost and schedule issues during design.
Before design, confirm the conditions you are inheriting:
A change of use or occupancy can add significant scope, so it is worth checking first.
Most delays come from steps people forget to schedule:
Working backward from the move-in date shows whether it is realistic before anything is committed.
Ideally during the test-fit or early design. Early input on cost, lead times, and existing conditions avoids redesign later.
A quick floor plan that shows how your program fits a specific space. It helps compare locations and reveals major upgrades before the lease is signed.
For most office and retail projects, several months before the move-in date. Projects with kitchens, medical equipment, or major system upgrades usually need longer.
Keep going with the next stage, or read related pages:
Every build-out connects specialty trades, the type of property, the stage of the project, and where it is built. Find the page you need below.